Please give us some details about the role you want to fill and let us know why you think our client might be the perfect candidate for you.
What happens next?
Our Job Search Specialist Mark Beltran will facilitate the next steps:
Mark will let our client know that you have shown an interest in their professional skills.
You will receive a full job application from our client and might want to offer them a formal job interview if you see the right potential in this candidate.
If you decide that you would like to offer the role to our client, we will help to make the next steps as smooth as possible.
You will be supported by our Licensed Immigration Advisers, who will take care of all visa related aspects of the process of offering our client a job.
Offering a job to our client will be straight forward.
Assistant Engineer/Technician with 8 years experience in engineering design, from initial concept and feasibility study through to detailed final design. Strong critical thinking skills with ability to use established analytical methods and engineering principles to identify strengths and weaknesses of alternative solutions and approaches to problems. Confident decision maker skilled in identifying relevant factors to reduce expenses and complete work on time and within budget. Friendly and approachable with good spoken and written English and confidence in interactions with clients and contractors. Experienced in working in multicultural teams as well independently and managing time across multiple jobs within a day.
Areas of Expertise
• Competence in reading building structural drawings and preparing civil engineering design of wastewater, stormwater, potable water, earthworks, and surface drainage networks
• Producing design and drawings using AutoCAD, as well as expertise with MSProject, Word and Excel
• Monitoring site works and acting as the engineer’s representative to contract
• Meeting with clients, understanding their requirements, and providing design solutions
• Dealing with clients, subcontractors, quantity surveyors and the overall project manager. Handled 500 labourers in the water structure zone in Maldives project.
• Preparation of reports to support engineering design and undertaking site investigations
Urban Development Authority, Sri Lanka State Ministry of Urban Development, Coast Conservation, Waste Disposal andCommunity Cleanliness, https://www.uda.gov.lk/
Project: Sethsiripaya Stage III is a 25-storeyed modern office building project – with a floor area of over 1.3 million square feet. This complex, when completed will include a modern office space, multifunction halls, meeting and conference facilities, commercial areas, restaurants, and parking for 700 vehicles. On Work inspection(Form work, Reinforcement work, concreting work, Setting out work). Once completed, Sethsiripaya Stage III is expected to cater to over 7500 occupants and 1000 visitors per day.
• Conduct daily on-site construction work inspection and provide technical solutions
• Documenting - Daily work progress, Daily concrete volume, Cube crushing report, etc.
• Quality control testing (Cube crushing test, Slump test, Sand cone test, etc)
• Ensure that health and safety and sustainability policies and legislation are adhered to
Buidmart Lanka (Pvt) Ltd, Construction& Consultancy, https://www.buildmartlanka.lk/
Project: PrimeResidencies Kassapa II, Colombo 5 (Sri Lanka) is an 8-storeyed fine apartment project encompassing 35 exclusive 2 & 3 Bedroom apartments.
• Planned, coordinated and supervised technical aspects of the project
• Managed parts of the work site including overseeing building work(Overall finishing work & structure work) and undertaking surveys.
• Checked technical designs and drawings to ensure that they were followed correctly.
• Supervised subcontractor staff and labourers.
• Ensured project met the agreed specifications, budgets and timescales
• Liaised with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager.
• Provided technical advice and solved problems on site.
• Prepared site reports and completed other paperwork (Daily work progress, Inspection report).
• Ensured that health and safety and sustainability policies and regulations were adhered to
Puritas (Pvt), Sri Lanka, Water andWastewater Treatment, https://www.puritas.lk/
Project: sewerage network project in R. Maakuruthu, Republic of Maldives
• Ensured that the construction work of the project was carried out according to the quality, time and cost requirements of the contract.
• Created well completions designs based on customers' requirements
• Prepared detailed designs including specifications, drawings andBOQs of sewerage network system, the pumping system, disposal/reuse system
• Maintained RFI log and issues log for weekly review by the consultant
• Responded to RFI's and kept daily logs and quantity book up to date
• Analysed existing site condition and site grading and designed proposed site grading and layout plan
• Directed all strategic planning and management for the scope of inspections
• Evaluated contractors’ procedure for execution, breakdowns for payments and subcontractors’ certifications for payments
• Inspected the installation of 8266' of new 6"UPVC sewer line,941' of 110/160Ǿ HDPE pressure line, 223' HDPE Sea outfall line, 120 nos of600mmǾ PE/PP maintenance shaft, 85 nos 160mmǾ UPVC clean out, 406 nos of house connection chambers, 3 nos of pump stations (4250mm depth and 2500mmǾ) and replacing the existing sewer line
• Coordinated and scheduled materials inspection and field testing
• Ensured that health and safety and sustainability policies and regulations were adhered to
• Monitored demolition activities in compliance with OSHA
• During the sea outfall pipe installation, ensured the least amount of effect on the sea coral bed
Nawaloka Construction Company (Private)Limited, Sri Lanka
Construction of Building, Bridges, Roads& Highways, https://www.nawalokaconstruction.com/
• Ensured that project construction work of the project was carried out according to the quality, time and cost requirements of the contract
• Liaised with clients, subcontractors and other professional staff, especially quantity surveyors and the overall project manager (handled 500labourers in water structure zone)
• Oversaw building work (structure work) including Form,Reinforcement and Concreting works, coordinating the required concrete volume with the batching plant, to the site of 5500m3volume of basement
Projects:
• Vakkaru Resort Project at Maldives, as Zone in charge of water structures. It is a tropical island that features 113 luxury villas and suites, five restaurants, two bars, a wine cellar and an over-the-water Spa
• ITC Colombo One Hotel and Residences is the capital city’s(Colombo, Sri Lanka) tallest residential tower, at 48 stories, connected by a dual sky bridge to a 29-story hotel.
• RIL Project, which is a 22-storey contemporary and luxurious office space located in the heart of Colombo with a rooftop that provides a view of Colombo’s skyline
Between July 2011 and Jan 2014 I worked as an Engineering Trainee(Civil) while studying
• National Diploma in Engineering Sciences (Civil)(2014)
• Certificate of Quantity Surveyor (2012)
• LionsClub volunteer and member of beach clean-up programme at Mt. Lavinia beach
• I enjoy travel and exploring the natural environment